On MnDOT contracts let between Jan 2023 and May 2026, the awarded unit price for 4" concrete walk (item 2521.518, line 00040) had a median of $9.00 per square foot in the Metro district and $7.78 in the rest of the state. That covers 28 Metro contracts and 33 outstate ones, counting walk lines of 300 SF or more. We read the bid abstracts for all 174 MnDOT contracts in that period with a walk item; files retrieved Oct. 12, 2026.

“Awarded unit price” here means the unit price of the bidder with the lowest total, which is who MnDOT awards to. On a single line that price can sit high or low if the bid was unbalanced, so the tables give quartiles and bidder counts, statewide and by district.

4" concrete walk, awarded unit prices

AreaContractsMedian bidders25th pctMedian75th pctLow–high
Metro district285$7.15$9.00$11.00$5.40–$15.34
Rest of state333$6.35$7.78$8.75$5.25–$20.00

Six of the 61 lines drew one bidder, including the Metro high of $15.34 and a 28,761 SF line at $5.25. They are marked in the row-level download (CSV). The Metro contracts are in Hennepin (13), Ramsey (6), Dakota (4), Scott (2), Carver, Anoka and Washington counties.

What the walk price does not include

On the abstracts we read, mobilization (2021.501), traffic control (2563.601, on all 174 contracts), concrete walk removal (2104.504 and 2104.518) and truncated domes (2531.618) are bid as separate items. Take those costs out of your own number before you compare it with the walk price.

All items

1,404 items from MnDOT's five-year bid history workbook, lettings Jan 2023 to Jun 2026, 506 contracts. B624 curb and gutter, for example, ran a median $38.00 per LF over 135 contracts, and 6" driveway pavement $88.30 per SY over 53. Every line counts here regardless of quantity, so the 4" walk figure in this table differs from the 300 SF cut above. The workbook lists the awarded price and the next three bidders' prices without names, so bidder counts stop at “4+”. A further 2,167 items had fewer than 5 contracts in the window and are left out; a district with fewer than 5 contracts for an item shows the count only.

ItemDescriptionUnitContractsLow25thMedian75thHighBiddersLatest
2531.618/00010TRUNCATED DOMESSF158$35.00$57.00$65.00$73.89$150.004+May 2026
2521.518/000606" CONCRETE WALKSF155$5.85$8.38$9.70$12.48$40.004+Jun 2026
2521.602/00030DRILL AND GROUT REINF BAR (EPOXY COATED)EACH155$1.00$11.00$15.00$20.00$97.004+May 2026
2521.618/00400CONCRETE CURB RAMP WALKSF144$6.00$13.27$15.65$18.00$37.004+May 2026
2531.503/02120CONCRETE CURB AND GUTTER DESIGN B424LF143$19.80$27.35$37.00$53.75$200.004+May 2026
2531.503/02320CONCRETE CURB AND GUTTER DESIGN B624LF135$0.44$28.18$38.00$55.00$168.004+Jun 2026
2533.503/03010PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337LF118$5.00$15.00$17.50$24.85$78.004+May 2026
2531.603/24020CONCRETE SILLLF99$0.21$7.70$11.21$17.22$125.004+Jun 2026
2531.603/24070CONCRETE CURB AND GUTTERLF80$2.87$38.66$45.47$55.92$100.004+May 2026
2533.503/03030RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337LF78$3.00$4.00$5.25$7.31$33.504+May 2026
2502.502/000404" PRECAST CONCRETE HEADWALLEACH73$191.13$350.00$500.03$732.12$2,5004+May 2026
2401.508/00011REINFORCEMENT BARS (EPOXY COATED)LB72$1.30$1.60$1.70$1.92$11.004+Jun 2026
2301.502/00010DOWEL BAREACH69$5.78$9.90$12.00$17.75$42.504+Apr 2026
2521.518/000404" CONCRETE WALKSF69$5.25$6.88$8.00$11.10$40.004+May 2026
2531.504/000808" CONCRETE DRIVEWAY PAVEMENTSY61$79.88$94.30$106.50$122.00$260.004+Apr 2026
2531.504/000606" CONCRETE DRIVEWAY PAVEMENTSY53$65.69$77.52$88.30$100.00$199.454+Apr 2026
2301.508/00010SUPPLEMENTAL PAVEMENT REINFORCEMENTLB49$0.80$2.48$3.36$4.40$15.004+Apr 2026
2531.503/04120CONCRETE CURB AND GUTTER DESIGN D424LF48$0.42$28.62$32.50$46.44$312.504+May 2026
2401.507/03643STRUCTURAL CONCRETE (3B52)CY47$550.00$900.00$1,054$1,295$6,0004+Jun 2026
2531.503/19220CONCRETE CURB AND GUTTER DESIGN S524LF47$1.03$27.00$30.02$42.54$60.004+Apr 2026
2301.602/00050DRILL AND GROUT DOWEL BAR (EPOXY COATED)EACH44$16.00$21.29$25.00$29.43$65.004+Apr 2026
2301.602/00071DRILL AND GROUT REINF BAR (EPOXY COATED)EACH40$1.00$13.00$18.02$25.45$44.504+May 2026
2401.618/00002SPECIAL SURFACE FINISH (INPLACE)SF39$2.40$3.25$4.50$5.00$7.624+Jun 2026
2411.508/00011REINFORCEMENT BARS (EPOXY COATED)LB39$1.40$1.67$2.00$2.78$12.004+Jun 2026
2533.503/03020PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 - ANCHOREDLF39$0.01$29.00$35.00$52.12$105.004+May 2026
2433.618/00110CONCRETE SURFACE REPAIRSF38$90.00$212.50$268.00$317.50$625.003Jun 2026
2521.518/000707" CONCRETE WALKSF37$7.35$8.96$10.35$11.45$17.804+Apr 2026
2433.502/00070ANCH TYPE REINF BARS (TYPE NT)EACH35$15.00$27.50$35.00$40.00$400.003Jun 2026
2433.603/00055REPAIR PAVING BRACKETLF35$25.00$57.50$90.00$120.00$190.003Jun 2026
2401.508/00010REINFORCEMENT BARSLB34$1.20$1.32$1.50$1.62$6.004+Jun 2026
2401.508/00027REINFORCEMENT BARS (STAINLESS-75KSI)LB34$3.25$4.50$5.00$5.30$10.004+May 2026
2401.503/08436TYPE S (TL-4) 36" BARRIER CONCRETE (3S52)LF33$68.00$95.00$120.00$136.75$376.524+May 2026
2402.502/08200BEARING ASSEMBLYEACH33$1,200$1,530$1,750$2,400$4,7504+Apr 2026
2531.503/02310CONCRETE CURB AND GUTTER DESIGN B612LF33$17.50$28.80$34.00$40.00$90.004+May 2026
2401.518/14001BRIDGE SLAB CONCRETE (3YHPC-M)SF32$22.00$31.90$35.00$41.25$95.004+Apr 2026
2433.506/00100SEAL CRACKS WITH EPOXY BY CHASE METHODGAL32$140.00$450.00$616.25$750.00$2,5004+Jan 2026
2531.503/02315CONCRETE CURB AND GUTTER DESIGN B618LF32$1.70$25.65$30.45$44.25$235.004+Apr 2026
2401.507/01143STRUCTURAL CONCRETE (1G52)CY30$432.59$535.68$645.00$750.00$2,5004+Jun 2026
2411.507/03252STRUCTURAL CONCRETE (3B52)CY29$404.00$588.32$850.00$1,750$5,5004+Jun 2026
2531.603/24130CONCRETE CURB DESIGN VLF29$24.00$34.12$51.00$80.50$120.004+Mar 2026
2433.502/00050ANCH TYPE REINF BARS (TYPE L)EACH27$20.00$27.57$35.00$45.00$180.203Feb 2026
2401.602/00470CONCRETE END POSTEACH26$5,500$7,500$8,000$9,000$15,0003Mar 2026
2433.618/00056REMOVE AND PATCH SLAB TYPE ASF25$20.00$27.00$30.00$35.00$80.003Jan 2026
2433.618/00057REMOVE AND PATCH SLAB TYPE BSF25$28.00$35.00$47.00$50.00$96.503Jan 2026
2433.618/00058REMOVE AND PATCH SLAB TYPE CSF25$5.25$62.50$75.00$100.00$275.003Jan 2026
2564.607/00110CONCRETE FOOTING (OVERHEAD SHAFT)CY25$1,780$2,763$3,100$3,575$4,9143Dec 2025
2531.503/18424CONCRETE CURB AND GUTTER DESIGN R424LF24$3.75$27.85$30.85$35.93$66.064+Apr 2026
2301.504/00080CONCRETE PAVEMENT 8.0"SY22$42.00$79.38$94.88$121.25$280.004+Mar 2026
2501.502/45030INSTALL CONCRETE APRONEACH22$242.40$500.00$765.51$1,251$3,5004+May 2026
2302.503/34020FULL DEPTH REPAIR (TYPE CD-HV)LF21$51.10$98.00$110.00$127.76$255.003Mar 2026
2433.603/02100RECONSTRUCT EXP JOINT TYPE DAVIDSONLF21$425.00$625.67$750.00$959.25$1,2003Jan 2026
2514.504/00010CONCRETE SLOPE PAVINGSY21$95.00$182.52$204.00$255.00$400.004+Apr 2026
2301.504/00070CONCRETE PAVEMENT 7.0"SY20$33.00$85.50$91.41$129.81$290.003.5Apr 2026
2302.504/00130PAVEMENT REPLACEMENT (TYPE CX)SY20$125.00$133.55$146.62$164.50$325.003Mar 2026
2401.518/03646SIDEWALK CONCRETE (3S52)SF20$3.00$11.50$15.00$21.25$50.004+Jun 2026
2402.502/08100ELASTOMERIC BEARING PADEACH20$125.00$150.00$200.00$225.00$2,1704+Apr 2026
2411.618/00220ANTI-GRAFFITI COATINGSF20$0.97$1.45$1.50$1.75$5.004+Apr 2026
2433.518/00008REMOVE CONCRETE WEARING COURSESF20$1.22$2.32$3.00$3.44$6.004+Jan 2026
2411.507/03752STRUCTURAL CONCRETE (3G52)CY19$400.00$750.00$1,050$1,500$5,1803Apr 2026
2433.603/00060RECONSTRUCT PAVING BRACKETLF19$65.00$77.50$125.00$235.00$620.003Jun 2026
2533.503/03040RELOCATE PORTABLE PRECAST CONCRETE BARRIER DES 8337-ANCHOREDLF19$7.00$17.50$23.00$32.00$53.004+Mar 2026
2401.518/14002BRIDGE SLAB CONCRETE (3YHPC-S)SF18$27.00$34.00$35.00$46.00$200.004+Jun 2026
2411.508/00010REINFORCEMENT BARSLB18$1.30$1.49$1.53$2.14$5.034+Jun 2026
2452.503/02012C-I-P CONCRETE PILING 12"LF18$35.00$48.00$63.40$88.20$130.004+Apr 2026
2506.602/06470CONCRETE COLLAREACH18$200.00$693.75$1,046$2,000$3,2003Jan 2026
2302.502/00020DOWEL BAREACH17$8.16$11.11$13.00$15.38$19.254+Mar 2026
2302.518/21000PARTIAL DEPTH REPAIR (TYPE BA)SF17$51.00$58.00$69.00$82.18$177.783Mar 2026
2531.503/02000CONCRETE CURB AND GUTTER DESIGN SPECIALLF17$23.00$50.52$95.00$288.00$375.004+Mar 2026
2301.504/00090CONCRETE PAVEMENT 9.0"SY16$40.45$93.12$101.61$119.69$185.824+May 2026
2411.502/00240CONCRETE INLET PADEACH16$10.00$1,903$2,956$3,825$4,5004+May 2026
2411.507/01752STRUCTURAL CONCRETE (1G52)CY16$466.00$562.50$895.00$995.00$2,3374+Jun 2026
2433.602/08010SUPPLEMENTAL DESCRIPTIONEACH16$46.40$690.00$1,700$5,500$25,0003Jun 2026
2554.602/00064POST IN CONCRETEEACH16$105.00$233.75$278.75$433.36$589.004+May 2026
2401.618/00300BRIDGE DECK PLANINGSF15$0.95$1.15$1.36$2.35$2.604+Apr 2026
2411.618/00320ARCHITECTURAL SURFACE FINISH (MULTI COLOR)SF15$2.10$3.50$4.50$5.96$8.004+Apr 2026
2521.518/000656" COLORED CONCRETE WALKSF15$12.90$14.55$16.78$27.81$44.454+Mar 2026
2232.603/00026MILLED RUMBLE STRIPS (CONCRETE)LF14$4.35$4.51$4.97$11.88$66.004+Apr 2026
2302.518/25100PARTIAL DEPTH REPAIR SPECIAL (TYPE BE)SF14$51.00$60.75$65.45$76.67$125.003.5Mar 2026
2401.503/07146TYPE MOD P-1 BARRIER CONC (3S52)LF14$90.00$114.00$210.00$250.00$350.004+Apr 2026
2404.518/00010CONCRETE WEARING COURSE (3U17A)SF14$6.00$6.00$8.75$15.75$25.004+Dec 2025
2433.502/00040ANCH TYPE REINF BARS (TYPE H)EACH14$26.49$35.00$48.00$75.00$380.004+Mar 2026
2533.603/03110CONCRETE MEDIAN BARRIER SPECIALLF14$236.00$398.75$550.00$713.92$1,1354+Apr 2026
2301.507/00010STRUCTURAL CONCRETECY13$111.30$117.52$124.00$137.68$1,1004+Mar 2026
2401.518/03647RAISED MEDIAN CONCRETE (3S52)SF13$13.00$15.00$16.95$21.50$134.004+Jun 2026
2401.601/00005MASS CONCRETE PROVISIONSLS13$2,000$4,500$17,000$25,000$160,0004+May 2026
2433.601/08010SUPPLEMENTAL DESCRIPTIONLS13$3,000$11,250$50,000$143,500$2,130,0002May 2026
2521.518/000303" CONCRETE WALKSF13$4.75$6.40$8.35$15.50$190.004+Mar 2026
2531.503/02060CONCRETE CURB AND GUTTER DESIGN B412LF13$20.26$22.87$27.00$31.73$48.004+May 2026
2531.503/02080CONCRETE CURB AND GUTTER DESIGN B418LF13$24.40$30.66$36.00$42.50$58.754+Apr 2026
2531.604/002088" CONCRETE VALLEY GUTTERSY13$95.00$108.25$135.00$175.75$240.004+Apr 2026
2302.502/00030DRILL AND GROUT REINF BAR (EPOXY COATED)EACH12$8.00$12.00$13.25$20.00$40.003Apr 2026
2404.618/00250CONCRETE WEARING COURSE (3U17A) 2.0"SF12$6.50$8.65$9.85$12.68$14.754+Jun 2026
2411.502/00210CONCRETE STAIRWAYEACH12$840.50$2,344$4,898$6,904$34,9054+Nov 2025
2433.603/08010SUPPLEMENTAL DESCRIPTIONLF12$14.90$116.25$412.50$900.41$5,5003May 2026
2531.503/18120CONCRETE CURB AND GUTTER DESIGN R424LF12$26.12$28.63$33.23$43.25$60.004+Nov 2024
2533.503/00110CONCRETE MEDIAN BARRIER DES 8308 TYPE ALF12$125.00$160.00$245.00$307.54$1,2193May 2026
2401.508/00013REINFORCEMENT BARS (CHROMIUM-EPOXY COATED)LB11$2.00$2.50$2.75$2.79$8.004+May 2026
2401.607/05010STRUCTURAL CONCRETE (SCC)CY11$250.00$1,988$2,750$3,017$7,6003Feb 2026
2405.503/02054PRESTRESSED CONCRETE BEAMS MN54LF11$330.00$427.50$480.00$775.00$1,0504+Apr 2026
2411.602/00370PRECAST CONCRETE CAPEACH11$1,350$1,500$2,028$2,500$3,5004+Apr 2026
2411.618/00530ARCHITECTURAL CONCRETE TEXTURE (ASHLAR STONE)SF11$0.63$12.00$18.60$22.00$75.004+Apr 2026
2433.502/00018REMOVE CONCRETE END POSTEACH11$350.00$750.00$782.50$2,175$4,0003.5Mar 2026
2531.504/00010CONCRETE MEDIANSY11$52.00$70.85$92.96$175.50$315.004+Jun 2026
2302.508/00210SUPPLEMENTAL REINFORCEMENT BARS (EPOXY COATED)LB10$1.65$2.40$3.00$5.25$8.003Mar 2026
2405.503/05054DIAPHRAGMS FOR TYPE MN54 PREST BEAMSLF10$68.00$132.00$150.00$191.25$400.004+Apr 2026
2433.603/00036REPAIR STRUCTURAL CRACKSLF10$45.00$107.00$120.00$165.75$850.003Jan 2026
2433.603/00440SEAL CRACKS WITH EPOXY BY CHASE METHODLF10$2.25$2.48$3.42$4.00$12.004+Feb 2026
2433.618/00059REMOVE AND PATCH SLAB TYPE DSF10$30.00$30.00$35.00$91.75$129.004+Mar 2026
2433.618/00060REMOVE AND PATCH SLAB TYPE ESF10$47.00$47.00$58.00$141.97$150.004+Mar 2026
2521.518/000757" COLORED CONCRETE WALKSF10$11.92$13.95$16.06$17.00$30.004+Mar 2026
2564.607/00150CONCRETE FOOTING (MONOTUBE)CY10$2,150$3,206$4,150$4,791$7,5004+Dec 2025
2301.504/00085CONCRETE PAVEMENT 8.5"SY9$37.25$65.50$97.00$114.25$127.563Apr 2026
2302.604/00080CONCRETE GRINDINGSY9$4.12$4.38$4.52$5.88$8.653Dec 2025
2401.503/09436TYPE MOD S (TL-4) 36" BARRIER CONCRETE (3S52)LF9$130.00$132.25$147.50$161.50$322.004+Apr 2026
2401.602/00461CONCRETE PILASTEREACH9$4,000$4,428$5,650$9,100$10,0004+Apr 2026
2433.518/00020MMA FLOOD SEALSF9$1.66$1.71$2.58$2.75$3.342Feb 2026
2433.602/00095CLEAN AND GREASE EXP BEARING ASSEMBLIESEACH9$305.00$480.00$750.00$1,350$2,0004+Jun 2026
2433.618/00013SCARIFY BRIDGE DECKSF9$1.59$2.20$3.30$10.20$14.103Oct 2025
2521.518/000636" CONCRETE WALK SPECIALSF9$16.00$16.91$26.38$40.35$104.003.5Jan 2026
2521.518/001404" BITUMINOUS WALKSF9$2.20$2.71$3.50$3.88$10.004+Apr 2026
2531.503/23704CONCRETE CURB DESIGN V4LF9$41.31$45.93$53.03$67.60$112.004+Feb 2026
2533.503/01541CONC MED BAR DES SINGLE SLOPE TYPE 54ALF9$92.00$109.00$146.00$166.00$600.004+Apr 2026
2232.603/00054MILL CONCRETE CURBLF8$5.56$12.09$23.50$50.00$125.003.5Apr 2026
2301.504/00075CONCRETE PAVEMENT 7.5"SY8$38.85$50.15$122.47$168.00$215.003.5Oct 2025
2405.503/00030PRESTRESSED CONCRETE BEAMS 30MHLF8$366.00$383.00$425.00$500.00$550.004+Apr 2026
2405.503/00035PRESTRESSED CONCRETE BEAMS 35MHLF8$325.00$390.00$401.00$470.44$478.014+Apr 2026
2405.503/00040PRESTRESSED CONCRETE BEAMS 40MHLF8$340.00$409.50$435.00$475.00$515.004+Apr 2026
2405.503/05240DIAPHRAGMS FOR TYPE 40MH PREST BEAMSLF8$68.00$80.00$100.00$126.00$200.004+Apr 2026
2411.618/00005MODULAR BLOCK RETAINING WALLSF8$33.75$41.85$87.88$105.00$125.004+Mar 2026
2433.603/00050RESEAL SLOPE PAVING JOINTSLF8$20.00$24.50$50.00$62.62$82.002.5Jun 2026
2433.603/02010RECONSTRUCT EXPANSION JOINT TYPE ALF8$425.00$625.00$900.00$900.00$1,2002Dec 2025
2433.618/00210RECONSTRUCT CONCRETE SLOPE PAVINGSF8$30.00$37.00$44.42$54.00$70.004+Mar 2026
2501.503/25030INSTALL CONCRETE CULVERTLF8$40.00$63.75$87.33$257.12$350.002.5Nov 2025
2232.603/00236MILLED SINUSOIDAL RUMBLE STRIPS CONCRETE-CLLF7$4.26$4.35$5.00$5.65$10.003Jan 2026
2301.504/00100CONCRETE PAVEMENT 10.0"SY7$45.85$110.80$117.70$143.00$180.002Dec 2025
2401.503/00346TYPE CURB BARRIER CONCRETE (3S52)LF7$25.00$34.95$73.00$109.45$150.004+May 2026
2401.503/07145TYPE P-1 BARRIER CONCRETE (3S52)LF7$75.70$83.81$130.00$165.00$225.004+Jun 2026
2401.507/03646STRUCTURAL CONCRETE (3S52)CY7$875.00$890.00$1,045$2,500$2,8004+Jun 2026
2402.602/08010SUPPLEMENTAL DESCRIPTIONEACH7$125.00$2,000$6,000$72,170$149,8503Dec 2025
2405.503/02045PRESTRESSED CONCRETE BEAMS MN45LF7$385.00$393.75$427.50$576.25$1,0003Apr 2026
2411.502/00030CONCRETE FLUMEEACH7$1,845$2,575$3,455$9,092$30,7203Jan 2026
2411.602/00260PLUG AND ABANDON CATTLE PASSEACH7$9,764$13,250$15,000$16,750$31,0003Mar 2026
2411.602/00435CONCRETE EMBLEM (SIGNAGE)EACH7$950.00$1,000$1,550$2,750$3,0003.5Jun 2026
2411.618/00535ARCHITECTURAL CONCRETE TEXTURE (CUT STONE)SF7$12.00$12.00$16.00$24.90$30.004+Dec 2025
2422.603/03609CONCRETE POSTS 12"X18"LF7$87.00$121.00$135.00$147.00$195.004+Sep 2025
2433.518/00007REMOVE CONCRETE SLAB, CURBS, OVERLAY, AND BARRIERSF7$12.00$15.00$30.00$59.10$70.002Jun 2026
2433.602/00080REPOSITION BEARINGEACH7$500.00$750.00$3,850$6,000$15,0004+Jun 2026
2531.503/04110CONCRETE CURB AND GUTTER DESIGN D412LF7$25.99$30.90$35.00$50.00$64.394+Mar 2026
2533.503/00140CONCRETE MEDIAN BARRIER DES 8308 TYPE AALF7$75.00$165.00$250.00$865.00$1,2194+Jun 2025
2533.503/01361CONC MED BAR DES SINGLE SLOPE TYPE 36ALF7$108.00$120.00$150.00$236.00$300.004+Apr 2026
2232.603/00226MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE)LF6$4.35$4.52$5.33$7.04$9.404+Apr 2025
2401.601/00300FOUNDATION PREP PILE BENT PIERSLS6$15,000$47,500$95,000$125,000$220,0004+Feb 2026
2402.602/08360SHEAR STUDSEACH6$6.00$7.50$8.00$12.00$21.523Dec 2025
2404.618/00300CONCRETE WEARING COURSE (3U17A) SPECIALSF6$8.00$8.75$16.00$19.38$20.503Apr 2026
2405.503/00686PRESTRESSED CONCRETE BEAMS 27MLF6$360.00$360.00$400.00$475.00$520.004+Feb 2025
2405.503/05045DIAPHRAGMS FOR TYPE MN45 PREST BEAMSLF6$75.00$75.00$95.00$100.00$400.003Apr 2026
2412.502/1208012X8 PRECAST CONCRETE BOX CULVERT END SECTIONEACH6$19,000$19,000$23,412$30,888$40,0004+Mar 2026
2412.503/1208012X8 PRECAST CONCRETE BOX CULVERTLF6$1,499$1,500$1,703$2,283$2,5324+Mar 2026
2433.503/00009REMOVE CONCRETE BARRIER AND WALLLF6$125.00$180.00$209.69$350.00$369.003Jan 2026
2433.503/00021REMOVE CONCRETE BRIDGE BARRIERLF6$100.00$140.60$200.00$387.50$800.004+Dec 2025
2433.602/00044RECONSTRUCT BEARING ASSEMBLYEACH6$5,800$6,200$8,663$9,500$10,0002Dec 2025
2433.602/00050RECONSTRUCT EXPANSION BEARINGSEACH6$2,900$3,000$3,500$6,000$10,9502Jun 2026
2433.602/00170EMBEDDED GALVANIC ANODEEACH6$55.00$62.50$69.40$113.75$155.003.5Apr 2026
2433.603/02040RECONSTRUCT EXPANSION JOINT TYPE DLF6$636.65$732.50$1,000$1,125$1,2703Jan 2026
2433.618/00045SILANE 100 PERCENTSF6$0.70$0.70$1.23$1.81$2.304+Apr 2025
2452.502/02060C-I-P CONCRETE TEST PILE 60 FT LONG 12"EACH6$4,500$4,875$6,115$9,430$16,0004+Feb 2026
2502.502/00090INSTALL PRECAST CONCRETE HEADWALLEACH6$128.42$182.10$200.00$262.50$300.004+Jan 2026
2521.518/000808" CONCRETE WALKSF6$8.80$9.06$13.76$16.66$17.034+Mar 2026
2531.503/23200CONCRETE CURB DESIGN SPECIALLF6$33.00$33.90$72.00$85.78$111.004+Dec 2025
2533.503/01544CONC MED BAR DES SINGLE SLOPE TYPE 54AALF6$105.00$131.25$195.00$294.52$314.004+Apr 2026
2533.503/01545CONC MED BAR DES SGL SLOPE TYPE 54A STEPLF6$120.00$123.75$151.50$178.40$188.584+Mar 2026
2533.503/01547CONC MED BAR DES SGL SLOPE TYPE 54 TRANSLF6$195.00$195.00$240.00$456.25$775.003.5Mar 2026
2533.503/02110CONC MED BAR & GL SCR DES 8309 TYPE ALF6$120.00$139.50$202.50$525.00$600.003.5Mar 2026
2564.507/00110CONCRETE FOOTING (OVERHEAD SHAFT)CY6$2,920$3,355$3,525$4,200$4,5004+Apr 2026
2301.503/04040INTEGRANT CURB DESIGN D4LF5$5.00$10.00$19.00$21.50$23.004+Mar 2026
2301.504/00060CONCRETE PAVEMENT 6"SY5$88.00$89.00$116.00$135.00$150.004+Feb 2026
2301.504/00095CONCRETE PAVEMENT 9.5"SY5$41.50$43.50$95.78$121.50$139.504+Apr 2026
2302.503/23000JOINT AND CRACK REPAIR (TYPE B3)LF5$55.00$58.00$65.90$240.00$400.004+Dec 2025
2401.507/01362STRUCTURAL CONCRETE (1P62)CY5$350.00$359.50$450.00$1,447$2,3943Jun 2026
2401.507/14001BRIDGE SLAB CONCRETE (3YHPC-M)CY5$675.00$835.00$1,750$1,775$1,7904+Apr 2026
2411.507/04060GRANULAR BACKFILL MOD (CV)CY5$24.20$137.10$258.21$262.55$265.004+Mar 2026
2411.618/00310ARCHITECTURAL SURFACE FINISH (SINGLE COLOR)SF5$1.45$1.45$1.62$2.00$3.504+Jan 2026
2411.618/00318ARCHITECTURAL SURFACE FINISH (THREE COLOR)SF5$1.45$2.90$3.45$3.86$6.004+Apr 2026
2412.502/060406X4 PRECAST CONCRETE BOX CULVERT END SECTIONEACH5$6,250$6,647$9,600$11,487$12,7744+Sep 2025
2412.503/060406X4 PRECAST CONCRETE BOX CULVERTLF5$700.00$747.50$808.00$847.84$880.004+Sep 2025
2433.502/00017REMOVE CONCRETE BEAMEACH5$5,000$6,250$15,000$41,750$68,5002Jun 2025
2433.601/00400CONSTRUCTION ACCESSLS5$150.00$5,075$72,000$3,298,000$5,990,0004+Apr 2026
2433.603/00200RECONSTRUCT CONCRETE BARRIERLF5$105.00$225.00$900.00$1,500$1,5002Dec 2025
2433.603/00400CLEAN AND SEAL DECK JOINTSLF5$13.04$14.51$16.00$25.50$30.003.5Dec 2025
2433.603/01100DISTRIBUTED GALVANIC ANODELF5$87.00$87.00$110.00$157.50$180.002Apr 2026
2433.607/00020CEMENT GROUTCY5$700.00$725.00$1,865$2,030$2,0602May 2025
2433.618/00061REMOVE AND PATCH SLAB TYPE FSF5$60.00$70.00$70.00$102.50$258.003Dec 2025
2452.502/02070C-I-P CONCRETE TEST PILE 70 FT LONG 12"EACH5$4,800$6,450$10,650$12,750$15,0004+Feb 2025
2452.502/02085C-I-P CONCRETE TEST PILE 85 FT LONG 12"EACH5$9,020$9,336$12,250$22,750$26,0004+Apr 2026
2502.502/000808" PRECAST CONCRETE HEADWALLEACH5$525.00$552.50$810.00$1,000$1,0004+May 2026
2521.518/001303" BITUMINOUS WALKSF5$2.40$2.42$3.15$11.80$19.004+Jun 2025
2531.503/02520CONCRETE CURB AND GUTTER DESIGN B824LF5$30.30$31.11$33.60$58.85$75.004+Nov 2025
2531.503/23706CONCRETE CURB DESIGN V6LF5$45.00$47.50$50.00$98.88$104.753Jan 2026
2531.503/23710CONCRETE CURB DESIGN V10LF5$44.80$48.90$54.10$75.00$90.004+Sep 2025
2533.503/00170CONCRETE MEDIAN BARRIER DES 8308 TYPE TRANSLF5$250.00$275.00$350.00$992.00$1,4843Jan 2026
2533.603/03111CONCRETE MEDIAN BARRIER DESIGN SPECIAL 1LF5$250.00$262.50$395.00$937.43$1,4003May 2026

201 items shown.

Download every item, statewide and by district (CSV)

How we built this

MnDOT publishes a bid abstract for every contract, a five-year bid history workbook and a yearly Average Bid Prices file. The yearly file is statewide, weighted by quantity and leaves out State Aid projects. Its 4" walk figure was $6.64 in 2023, $8.24 in 2024 and $8.28 in 2025, so expect it to differ from the district medians above.

We took walk prices from the abstracts and checked them against the workbook. All 224 awarded walk lines, 4" and 6", match on contract, item and quantity, and in every abstract the first bidder's price equals the workbook's awarded price. Engineer's estimates are left out, as are colored, exposed aggregate, reinforced and special walk items. District names come from joining the workbook's district codes to the abstracts.

Source workbook: MnDOT eDocs docId 39052078 (SHA-256 4d977777f240…). MnDOT's own files are linked from its cost estimating page. The same abstracts feed the SlabCalc Concrete Cost Index; its methodology lists the agency, district and bid item for every metro.